Find the right path for the work.
Each page has its own job: a service, industry, authority/location or practical question.
Traffic management in New Zealand
Traffic management in New Zealand is the planning, documentation and on-road coordination used to keep workers, drivers, pedestrians, cyclists and property access moving safely when work or events affect the road corridor.
Open page →knowledgeWhat is a TMP in New Zealand?
A Traffic Management Plan (TMP) is a site-specific plan explaining how temporary traffic management will be designed, installed, monitored, changed and removed while work or an event affects a New Zealand road corridor. It should connect the work method, risks, road users and controls rather than operate as a generic drawing.
Open page →knowledgeWhat is a CAR application?
A Corridor Access Request is the application pathway used when work affects the road corridor. It usually needs clear location, date, method, TMP and contact information before a WAP is issued.
Open page →knowledgeTMP vs CAR vs WAP
A TMP explains traffic management, a CAR requests access to the corridor, and a WAP is the permit or approval pathway issued by the relevant authority when conditions are met.
Open page →knowledgeNZGTTM explained for contractors
NZGTTM is New Zealand's risk-based guide for temporary traffic management. It encourages planning controls around the actual work, people, road environment and risk instead of relying only on fixed template thinking.
Open page →knowledgeWhat information is needed for a TMP?
A good TMP brief includes location, dates, work method, staging, site drawings, road-user impacts, pedestrian routes, plant movements, hours, photos and known RCA or council requirements.
Open page →knowledgeHow long does TMP approval or review take?
Review time depends on the RCA, road environment, complexity, completeness of the submission and urgency. Contractors should avoid promising start dates until the relevant authority has completed its review.
Open page →knowledgeWhy councils issue RFIs on TMPs
RFIs usually happen when the reviewer cannot see how the TMP matches the work, site, dates, pedestrian effects, access needs, methodology or risk controls.
Open page →knowledgeTMP design cost guide NZ
TMP design cost is scope-dependent. Simple frontage works may be lower cost, while staged civil works, closures, state highways, events and amendment-heavy submissions need more design time.
Open page →knowledgeVehicle crossing TMP guide
Vehicle crossing TMPs need clear frontage, footpath, pedestrian, driveway, concrete pour, access and CAR information so the authority can understand the temporary impact.
Open page →knowledgeFootpath closure TMP guide
A footpath closure TMP should show how pedestrians, mobility users and nearby accesses are managed safely while the work affects the normal walking route.
Open page →knowledgeStop/Go TMP guide
A stop/go TMP explains alternating traffic flow, work area, visibility, queue management, road-user delay, manual control positions and pedestrian or side-road effects.
Open page →knowledgeShoulder closure TMP guide
A shoulder closure TMP should define the shoulder work area, work vehicle access, live-lane clearance, warning layout, pedestrian or cyclist effects and risk controls.
Open page →knowledgeRoad closure TMP guide
A road closure TMP needs closure extents, detour logic, emergency access, affected properties, stakeholder considerations, reopening process and clear timing.
Open page →knowledgeEvent traffic management planning guide
Event traffic planning should start early because closures, pedestrians, parking, emergency access, resident impacts and RCA timelines often need more detail than organisers expect.
Open page →knowledgeContractor checklist before requesting a TMP
Before requesting a TMP, collect the scope, location, dates, hours, photos, marked-up plan, work method, plant movements, access needs and any RCA comments.
Open page →knowledgeCouncil submission checklist
A stronger council submission aligns the TMP, CAR, WAP details, dates, scope, road impacts, work method, drawings and contact information before review.
Open page →knowledgeRisk-based TMP checklist
A risk-based TMP should connect the work activity, road environment, road users, exposure, timing, access, staging and selected controls in plain language.
Open page →knowledgeCommon TMP mistakes
Common TMP mistakes include vague work descriptions, copied controls, missing pedestrian routes, date mismatches, unclear drawings, no access plan and incomplete responses to RCA comments.
Open page →knowledgeGlossary: TMP, TTM, STMS, TMO, RCA, CAR, WAP, TMD, NZGTTM, CoPTTM, PCBU, SSSP, JSA
Traffic management language can be confusing. This glossary explains common New Zealand TMP, TTM, CAR, WAP, RCA and NZGTTM terms in plain English for contractors.
Open page →