Traffic management service

TMD / Traffic Management Drawing Updates

Traffic Management Diagram updates for changed staging, closures, access points, pedestrian routes or specific RCA review comments.

01PlanScope, drawings and documentation
02CoordinateAuthority comments and conditions
03EstablishPeople, vehicles, signs and devices
04ManageLive operation, changes and close-out
01

Change the drawing without creating a document conflict

A TMD revision should reflect the current work area, tapers, access, closures and temporary routes while remaining consistent with the TMP text and staging notes.

  • Check that notes, symbols and work limits describe the same arrangement.
  • Update affected pedestrian, cyclist, side-road and property-access information.
02

Drawing files and mark-ups to provide

Send the existing TMD, current TMP, clear site mark-ups and the requested changes. Include the reviewer comment or site reason behind the revision where available.

  • Identify the base plan or aerial information that is no longer current.
  • Show each changed stage separately if one diagram cannot represent the sequence clearly.
03

Issue the update with traceable revision notes

The scope check can confirm whether the work is a drawing-only update or also requires TMP text, CAR or WAP information to change.

  • State the revision purpose and intended use of the updated drawing.
  • Confirm which version should replace the set currently held by the site team.
Start with the job details

Tell us what is happening on the road or at the worksite.

Send the location, intended dates, work activity and any drawings, authority comments or site information already available.