01PlanScope, drawings and documentation
02CoordinateAuthority comments and conditions
03EstablishPeople, vehicles, signs and devices
04ManageLive operation, changes and close-out
01
Translate the civil sequence into traffic stages
Earthworks, drainage, pavement and frontage activity may use different work areas and access routes. The TMP and drawings should identify the controls that apply to each relevant stage.
- Link plant and delivery movements to the current work area.
- Keep side-road, pedestrian, cyclist and property-access effects visible as the programme changes.
02
Civil planning brief for TMP and CAR support
Send the site location, programme, construction drawings, methodologies, stage limits, dates, hours, plant movements and photos. Include corridor excavation and reinstatement information where relevant.
- Identify the stage that needs documentation first.
- Forward authority comments and changed construction information with the current file set.
03
Scope the next stage before site mobilisation
A first review can confirm the TMP, TMD, CAR or WAP information needed and whether on-site establishment and traffic management form part of the request.
- Nominate the current programme and drawing revision.
- State which contractor interfaces or access arrangements remain unresolved.